So we can change the trigger form ops == 3 to mm == 304 to have the three apu available and tvc valves opened ?
regardless of a manual OPS 104 transition somehow the DAP wasn't properly changed. I suppose we must do as the real Shuttle does and check whether the cutoff-buttons have been pressed to detect such a situation - in the event I used CTRL+M to manually force the transition
it was actually counted negative
I observed a strange behavior with last commits. After RTLS MECO, it goes to mm 104 like if it was a regular meco condition.
When entering a TIG early on after MECO ( like for OMS 1 autoload) , the forecasted Apsis are not calculated correctly.
Users browsing this forum: No registered users and 2 guests